| | MTO SS Drawings | SSD | 00 - SSD Information | n/a | SSD Complete Manual - Rev. 010 | Oct 2024 |
| | MTO SS Drawings | SSD | 00 - SSD Information | n/a | SSD Index - Rev. 010 | Oct 2024 |
| | MTO SS Drawings | SSD | 00 - SSD Information | n/a | SSD Revision Package - Rev. 010 | Oct 2024 |
| | MTO SS Drawings | SSD | 00 - SSD Information | n/a | SSD Revision Sheet - Rev. 010 | Oct 2024 |
| | MTO SS Drawings | SSD | 00 - SSD Information | n/a | SSD Revision Sheets All - Rev. 001 to 010 | Oct 2024 |
| | MTO SS Drawings | SSD | 02 - Design, Drafting | 102.0001 | Structural Standard Drawings Layering Structure | Jul 2021 |
| | MTO SS Drawings | SSD | 03 - Piles | 103.0011 | Pile Driving Control | Apr 2008 |
| | MTO SS Drawings | SSD | 05 - Abutments, Walls | 105.0001 | Retaining Wall Details | Jan 2013 |
| | MTO SS Drawings | SSD | 05 - Abutments, Walls | 105.0003 | Retaining Wall - Rustication Details | Jul 2021 |
| | MTO SS Drawings | SSD | 05 - Abutments, Walls | 105.0011 | Wingwall With Non-Integral Abutment | Jul 2023 |
| | MTO SS Drawings | SSD | 05 - Abutments, Walls | 105.0012 | Wingwall With Integral Abutment | Jul 2023 |
| | MTO SS Drawings | SSD | 05 - Abutments, Walls | 105.0023 | Details of Concrete Slope Paving | Aug 2023 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0008 | Grout Vent Detail | Jul 2021 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0009 | Minimum Bracing Requirements for NU Girders Installation | Jan 2023 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0011 | Prestressed Box Girders and Bearings (B700) | Jul 2019 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0012 | Prestressed Box Girders and Bearings (B800) | Jul 2019 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0013 | Prestressed Box Girders and Bearings (B900) | Jul 2019 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0014 | Prestressed Box Girders and Bearings (B1000) | Jul 2019 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0015 | Prestressed Box Girders Details | Oct 2020 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0016 | Prestressed NU Girders and Bearings NU 900 (Steel Rebar) | Jul 2019 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0017 | Prestressed NU Girders and Bearings NU 1200 (Steel Rebar) | Jul 2019 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0018 | Prestressed NU Girders and Bearings NU 1400 (Steel Rebar) | Jul 2019 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0019 | Prestressed NU Girders and Bearings NU 1600 (Steel Rebar) | Jul 2019 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0020 | Prestressed NU Girders and Bearings NU 1800 (Steel Rebar) | Jul 2019 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0021 | Prestressed NU Girders and Bearings NU 1900 (Steel Rebar) | Jul 2019 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0022 | Prestressed NU Girders and Bearings NU 2000 (Steel Rebar) | Jul 2019 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0023 | Prestressed NU Girders and Bearings NU 2400 (Steel Rebar) | Jul 2019 |
| | MTO SS Drawings | SSD | 07 - Prestressed Concrete | 107.0024 | Prestressed NU Girders - Details | Jul 2019 |
| | MTO SS Drawings | SSD | 09 - Deck, Curbs | 109.0015 | Provision For Future Light Pole Base | Jul 2021 |
| | MTO SS Drawings | SSD | 09 - Deck, Curbs | 109.0016 | Retrofit Light Pole Base | Jul 2021 |
| | MTO SS Drawings | SSD | 09 - Deck, Curbs | 109.0042 | Partial Depth Precast Deck Panels for Steel Girders - Details | Jul 2023 |
| | MTO SS Drawings | SSD | 09 - Deck, Curbs | 109.0044 | Partial Depth Precast Deck Panels for NU Girders - Details | Jul 2023 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0001 | Thrie Beam Guide Rail, Rail Detail | Jul 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0002 | Box Beam Guide Rail - Side Mount, Assembly Detail, Test Level 2 | Jul 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0003 | Box Beam Guide Rail - Side Mount, Post and Attachment Details, Test Level 2 | Jul 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0004 | Box Beam Guide Rail - Side Mount, Rail and Splice Detail, Test Level 2 | Jul 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0005 | Thrie Beam Guide Rail - Side Mount, Assembly Detail, Test Level 2 | Jul 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0006 | Thrie Beam Guide Rail - Side Mount, Post and Attachment Details, Test Level 2 | Jul 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0007 | Thrie Beam Guide Rail - Timber Deck, Assembly Detail, Test Level 2 | Jul 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0008 | Thrie Beam Guide Rail - Timber Deck, Post and Attachment Details, Test Level 2 | Jul 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0009 | Thrie Beam Guide Rail, Connection Detail, Steel Beam Guide Rail | Jul 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0021 | Railing For Barrier/Parapet Wall | Mar 2015 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0022 | Multi Use Path (MUP) Bicycle Barrier | Jan 2022 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0033 | Inspector Guard Details | Dec 2018 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0034 | Four Tube Combination Traffic/Bicycle Railing, TL-4 | Aug 2019 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0035 | End Connection for Four Tube Combination Traffic/Bicycle Railing and Approach Rail Transition | Mar 2018 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0036 | Four Tube Combination Traffic/Bicycle Railing, TL-4 (With Concrete End Wall) | Aug 2019 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0037 | Three Tube Railing on Curb, TL4 | Aug 2019 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0038 | End Connection for Three Tube Curb Railing and Approach Rail Transition | Sep 2016 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0039 | Three Tube Railing on Curb - TL4 (With Concrete End Wall) | Aug 2019 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0046 | Four Tube Railing on Sidewalk, TL-4 | Aug 2019 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0047 | End Connection for Four Tube Curb Railing and Approach Rail Transition | Sep 2016 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0049 | Four Tube Railing on Sidewalk - TL4 (With Concrete End Wall) | Mar 2016 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0054 | Barrier Wall With Railing, TL-4 (Stainless Steel Rebar) | Sep 2016 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0056 | Parapet Wall With Railing, TL-4 (Stainless Steel Rebar) | Sep 2016 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0057 | Parapet Wall With Railing On Sidewalk , TL-4 (Stainless Steel Rebar) | Sep 2016 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0058 | Barrier Wall With Railing, TL-4 (GFRP Grade III Rebar) | Feb 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0059 | Parapet Wall With Railing, TL-4 (GFRP Grade III Rebar) | Feb 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0061 | Barrier Wall Without Railing, TL-5 (Stainless Steel Rebar) | Dec 2017 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0062 | Reinforced Concrete Median Barrier Wall on Structures - Type I | Sep 2016 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0063 | Reinforced Concrete Median Barrier Wall on Structures - Type II | Sep 2016 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0064 | Barrier Wall Without Railing On RSS Wall, TL-5 (Stainless Steel Rebar) | Dec 2017 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0065 | Parapet Wall With Railing On RSS Wall, TL-4 (Stainless Steel Rebar) | Dec 2017 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0066 | Concrete End Wall for Box Beam Railing (Stainless Steel Rebar) | May 2018 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0068 | Barrier Wall With Railing On RSS Wall, TL-4 (Stainless Steel Rebar) | Dec 2017 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0069 | Barrier Wall With Railing On RSS Wall, TL-4 (GFRP Grade III Rebar) | Feb 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0070 | Barrier Wall With Architectural Finish, TL-5 (Stainless Steel Rebar) | Dec 2017 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0071 | Architectural Finish (Type A) for TL-5 Barrier Wall | Sep 2017 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0072 | Architectural Finish (Type B) for TL-5 Barrier Wall | Sep 2017 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0073 | Architectural Finish (Type C) for TL-5 Barrier Wall | Sep 2017 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0074 | Architectural Finish (Type D) for TL-5 Barrier Wall | Sep 2017 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0075 | Parapet Wall With Railing On RSS Wall, TL-4 (GFRP Grade III Rebar) | Feb 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0082 | Parapet Wall for Combination Traffic/Bicycle Rail, TL-4 (Stainless Steel Rebar) | Sep 2016 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0083 | Parapet Wall for Combination Traffic/Bicycle Rail, TL-4 (GFRP Grade III Rebar) | Feb 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0084 | Parapet Wall for Combination Traffic/Bicycle Rail, TL-4 (GFRP Rebar With Anchor Head) | Feb 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0085 | Railing on Parapet for Combination Traffic/Bicycle Rail, TL-4 | Aug 2019 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0090 | Parapet Wall With Railing, TL-4 (GFRP Rebar With Anchor Head) | Feb 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0091 | Barrier Wall With Railing, TL-4 (GFRP Rebar With Anchor Head) | Feb 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0092 | Barrier Wall Without Railing, TL-5 GFRP (Rebar With Anchor Head) | Feb 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0093 | Barrier Wall With Architectural Finish, TL-5 (GFRP Rebar With Anchor Head) | Feb 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0094 | Barrier Wall Without Railing, TL-5 (GFRP Rebar With Hook Bar) | Aug 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0095 | Parapet Wall For Two Tube Railing, TL-5 (Stainless Steel Rebar) | Sep 2016 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0096 | Two Tube Railing on Parapet, TL-5 | Aug 2019 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0097 | Parapet Wall With Railing On Sidewalk TL-4 (GFRP Grade III Rebar) | Feb 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0098 | Parapet Wall With Railing On Sidewalk, TL-4 (GFRP Rebar With Anchor Head) | Feb 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0099 | Barrier Wall With Architectural Finish, TL-5 (GFRP Rebar With Hook Bar) | Aug 2021 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0100 | Precast Transition Concrete Barrier at Sign Supports and Poles Median Mounted (Symmetrical) | Jan 2012 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0101 | Precast Transition Concrete Barrier at Sign Supports and Poles Median Mounted (Asymmetrical) | Jan 2012 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0102 | Precast Transition Concrete Barrier at Sign Supports and Poles - Reinforcing and Connection Details (Symmetrical) | Jul 2014 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0103 | Precast Transition Concrete Barrier at Sign Supports and Poles - Reinforcing and Connection Details (Asymmetrical) | Jul 2014 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0104 | Parapet Wall With Railing, TL-4 (Black Steel Rebar) | Sep 2016 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0105 | Parapet Wall With Railing On Sidewalk, TL-4 (Black Steel Rebar) | Sep 2016 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0109 | Barrier Wall Without Railing, TL-5 (Black Steel Rebar) | Jul 2017 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0110 | Multi Use Path (MUP) Separation Barrier (Parapet), TL-4 | Jun 2020 |
| | MTO SS Drawings | SSD | 10 - Barriers, Railings | 110.0111 | Multi Use Path (MUP) Separation Barrier, TL-5 | Jun 2022 |
| | MTO SS Drawings | SSD | 12 - Reinforcing Steel | 112.0001 | Hook Dimensions for Reinforcing Steel Bars | Oct 2022 |
| | MTO SS Drawings | SSD | 13 - Bearings, Exp. Joints | 113.0010 | Strip Seal Expansion Joint Assembly for Barrier Walls | Jan 2023 |
| | MTO SS Drawings | SSD | 13 - Bearings, Exp. Joints | 113.0011 | Strip Seal Expansion Joint Assembly for Barrier Walls - With Drainage System | Jan 2023 |
| | MTO SS Drawings | SSD | 13 - Bearings, Exp. Joints | 113.0012 | Strip Seal Expansion Joint - Type 'A' Details | Jan 2023 |
| | MTO SS Drawings | SSD | 13 - Bearings, Exp. Joints | 113.0013 | Strip Seal Expansion Joint - Type 'C' Details | Jan 2023 |